Commissioning Request Form

"*" indicates required fields

By signing this form, you are certifying that the below items are, or will be, completed prior to the requested commissioning date. You also hereby confirm and agree that Traxon Technologies is relying on your acknowledgment to schedule personnel and commit resources (including travel costs and expenses) and that any additional labor or cost incurred by Traxon as a result of a false representation in this document may result in additional charges being billed to you. Commissioning requires a minimum of three (3) weeks advanced notice to schedule services.
Name of Requestor:*
Installation Address:*
Site Contact:*
Is personal protective equipment required by our agent?*
Are there any restrictions as to when our agent can be onsite?*
Are there any third party fixtures/drivers/PSUs being used on this job?*
Drop files here or
Accepted file types: jpg, png, pdf, Max. file size: 250 MB.
    Please confirm that all Traxon equipment has been installed as shown in project specific submittals:
    If project specific submittals were not done, please confirm that all Traxon equipment has been installed according to product's data sheets and installation guides:
    Have Traxon components been energized?*
    Please advise the primary voltage being used on this job:*

    Is this installation indoors or outdoors?*
    Please confirm that all RJ-45 connections and Cat6 cable have been properly tested:*
    Please confirm that access to all Traxon components will be available onsite:
    Please indicate the type of control system you have:

    Is there a network connection to the controls system?*
    Are the server/Core S/Glasstouch in a climate-controlled location?*
    Please confirm that there is internet access at the location of all controls components:
    Please confirm that an electrician will be present for the duration of programming and commissioning to work with our agent in all duties that are required to complete programming and commissioning:*
    I certify that the design team, architect, owners and/or chief decision makers have been notified of our technician's site visit. All programming information must be provided in advance of the technician arriving onsite and all decision makers must be onsite for final approval:*
    At what time do you wish for commissioning and programming to begin each day?
    :
    Desired Turn-On Date:*
    Drop files here or
    Accepted file types: jpg, png, pdf, Max. file size: 250 MB.
      I confirm that I have read all terms and conditions presented in this form and have filled out said form with accuracy and to the best of my ability:*

      Once this form is submitted, you will be contacted by a Traxon representative to formalize your project's commissioning and programming.

      Thank you for being a Traxon customer.